Pressurised Pipe / Flange Fitting

The rig will consist of a wall mounted arrangement consisting of a 40NB Pipework manifold c/w flanges which will have a corresponding manifold and flanges to allow the trainees to simulate bolting together of pipework spools.

This Rig will incorporate a sealed ring main and will include the use of isolation ball valves to allow the unit to be:

  • Pressurised
  • Isolate a certain section
  • Drain the section
  • Remove the section
  • Re-orientate
  • Re-fit section
  • Charge with water
  • Pressurise to check the trainee has reconnected properly

Designed in partnership with EDF Energy.