Pressurised Pipe / Flange Fitting
The rig will consist of a wall mounted arrangement consisting of a 40NB Pipework manifold c/w flanges which will have a corresponding manifold and flanges to allow the trainees to simulate bolting together of pipework spools.
This Rig will incorporate a sealed ring main and will include the use of isolation ball valves to allow the unit to be:
- Pressurised
- Isolate a certain section
- Drain the section
- Remove the section
- Re-orientate
- Re-fit section
- Charge with water
- Pressurise to check the trainee has reconnected properly
Designed in partnership with EDF Energy.